Sign in | Join Now | Sitemap Inquiry Basket(0)
logo
Home > News

The proper use of combine (1) [2008-12-03]

1. Test run. The new machine or maintenance after the harvester, the need for commissioning run-in.
â‘  engine test run. According to the maintenance overhaul, decided to cold, hot run-in operation, check oil pressure gauge, thermometer oil, water tables are in working order, whether or not oil, water, abnormal sound.
â‘¡ walking test run. 1 can file, the file 2, 3 files, reverse the order of, respectively, left, right turn, check steering, brakes if sensitive, interlocking bodies clutch reliability.
â‘¢ cutting, threshing, separation pay has been working shirk commissioning agencies to check the reliability of the monitoring instruments and sensitivity.